DDefine
Frame the problem
How can the overall performance of Heat Pump line 2 be improved while using fewer resources, keeping the production volume and the quality standards?
- DMAIC
- 5W2H
- SIPOC
- Line concept
- Go from 3 to 2 shifts without losing capacity
- Balance the workload between workstations
- Improve the ergonomics of the workstations
- Reduce waste
- Bring actual output closer to theoretical output
- Set up simple monitoring to sustain the results