Skip to content
AMINE.OS
Esc

Loading the 3D map…

Employed · Project Engineer · SNTL · Rabat

Amine Ourfi

State-certified Industrial Engineer

Industrial engineering for performance: Lean, continuous improvement, logistics and project management — with digital tools in support.

  • Continuous improvement
  • Lean
  • Industrial performance
  • Logistics & supply chain
  • Project management
  • Process optimisation
Profile in 30 sCV

Stop 01Casablanca2019 – 2022

ESITH

Professional bachelor’s degree · 2019 – 2022

Supply chain management

Input
Studies
Transformation
Supply chain
Output
Professional bachelor’s
STOP 01 · ESITH · CASABLANCA
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  • Professional bachelor’s degree in supply chain management.
  • Final-year internship at Dachser.

Stop 02Mohammedia2022

Dachser

Final-year internship · bachelor’s · 26 February – 27 May 2022

Digitalisation of non-conformities

Input
Paper forms
Transformation
Entry · automation · tracking
Output
Automatic PDF + KPI
STOP 02 · DACHSER · MOHAMMEDIA
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  5. Step 5:
  6. Step 6:
  7. Step 7:
  • Excel/VBA tool replacing the paper non-conformity forms.
  • Automatic generation of the forms in PDF and sending to customers.
  • Automated dashboard: KPIs and tracking charts.

Access control2022

Internal competitive exam

After the professional bachelor’s degree, admission to the ESITH industrial engineering programme through an internal competitive exam.

Stop 03Casablanca2022 – 2025

ESITH

Industrial engineering programme · 2022 – 2025

State-certified Industrial Engineer

Input
Bachelor’s + exam
Transformation
Industrial engineering
Output
State engineer
STOP 03 · ESITH · CASABLANCA
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  • Industrial engineering programme at ESITH, same school, higher level.
  • State Engineering Degree in Industrial Engineering — international logistics.

JunctionEnd of 1st year

Specialisation

International logistics

Branch chosen at the end of the first year of the engineering programme.

Stop 04Casablanca2024

MaFoder

Second-year internship · 1 – 26 July 2024

Layout of a storage area

Input
Storage area
Transformation
Measurements · plan · layout
Output
Layout plan
STOP 04 · MAFODER · CASABLANCA
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  5. Step 5:
  • Survey of the dimensions and warehouse plan within the constraints of the space.
  • Layout plan to structure the storage area.

Stop 05Tangier, TAC2025

FIT Voltaira

Final-year internship · 3rd year · 3 March – 20 June 2025

Optimisation of a Heat Pump assembly line

Input
Assembly line
Transformation
Time Study · balancing · standard
Output
+33 % productivity
STOP 05 · FIT VOLTAIRA · TANGIER
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  • Time Study, task rebalancing and standardised workstations.
  • Ergonomics and In/Out flows redesigned to reduce work in progress.
  • Visual indicators to manage the workshop.

+33 %productivity+7 ptsoverall efficiency

Open the dossier →

Stop 06RabatSince 2026

SNTL

Current position · Since 2 February 2026

Project Engineer

Input
Business needs
Transformation
AS-IS → TO-BE · steering
Output
Optimisation projects
STOP 06 · SNTL · RABAT
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  5. Step 5:
  6. Step 6:
  • Leading business process optimisation projects.
  • AS-IS analysis, TO-BE design, functional specifications.
  • Steering committee governance, action plans and KPI tracking.

Next destination

To be defined.

The road goes on beyond the last stop. What comes next is open.

PROCESS 01 · CONTINUOUS IMPROVEMENT

Observe, analyse, optimise, standardise, measure.

A bottleneck appears, it is analysed, the line is rebalanced, the good practice becomes the standard, and the indicator proves it.

The same loop in every assignment

PROCESS 01 · CONTINUOUS IMPROVEMENT LOOP
LINE · WORK FLOWSCALE 1:1 · FLOW → LEFT TO RIGHT000160320480640ANALYSINGALERT · BOTTLENECKOPTIMISINGNOMINALINOUTREBALANCING! BOTTLENECK DETECTEDWORK STANDARDKPI · FLOW EFFICIENCY▲01 OBSERVE02 ANALYSE03 OPTIMISE04 STANDARDISE05 MEASURE
  1. Step 1:
  2. Step 2:
  3. Step 3:
  4. Step 4:
  5. Step 5:
Location
Rabat, Morocco
Currently
Project Engineer · SNTL
Languages
Arabic · French · English · Spanish

State-certified industrial engineer specialised in international logistics, with experience in industrial environments and in leading process optimisation projects. Skills in continuous improvement, flow analysis and operational performance.

  1. OP-01

    Observe

    Measure the shop floor before deciding.

    Applied

    • Time studies on an assembly lineFIT Voltaira
    • Survey of a storage area’s dimensionsMaFoder
  2. OP-02

    Analyse

    Understand the current state and its gaps.

    Applied

    • Analysis of existing processes (AS-IS)SNTL
    • Analysis of performance indicatorsDachser
  3. OP-03

    Optimise

    Cut waste, rebalance, standardise.

    Applied

    • Task rebalancing and standardised workstationsFIT Voltaira
    • Layout plan of the storage areaMaFoder
    • Design of target processes (TO-BE)SNTL
  4. OP-04

    Standardise

    Set the best practice so the gain lasts.

    Applied

    • Standardisation of the workstationsFIT Voltaira
    • Non-conformity handling standardised and automated (Excel/VBA)Dachser
    • Writing of functional specificationsSNTL
  5. OP-05

    Measure

    Manage by indicators, and prove the gain.

    Applied

    • +33 % productivity, +7 points of overall efficiencyFIT Voltaira
    • Visual shop-floor indicatorsFIT Voltaira
    • Follow-up of KPIs and action plans in steering committeesSNTL

PROCESS 02 · PERFORMANCE

Measured results.

Every figure has its source

productivity on an assembly line, with the same headcount
+33 %
FIT Voltaira · 2025
overall efficiency on the same line
+7 pts
FIT Voltaira · 2025
experiences in industry, logistics and project management
4
2022 — today
in French (TCF 670/699)
C2
TCF certification

PROCESS 03 · PROJECTS

Don’t read the projects. Step inside.

The shop floor, the problem, the actions, the result: each dossier is explored the way you walk through the workshop.

Interactive dossier · 3DFIT Voltaira · Tangier, TAC · final-year internship

+33 %hourly outputwith the same headcount

How? Step into the line and watch it transform, station by station.

Optimisation of a Heat Pump assembly line

Increase the productivity of a heat pump assembly line, without adding staff.

Overall efficiency
+7 pts
better use of resources
Organisation
3 → 2
shifts, with no loss of capacity
Step into the 3D line11 steps DMAIC · Before / After
BOTTLENECK

Before · the bottleneck slows the lineAfter · balanced flow

Interactive dossier · 3DDachser · Mohammedia · final-year internship (bachelor’s degree)

12 → 5 minnon-conformity form7 minutes saved per case handled

How? Follow a non-conformity, from the damaged pallet to the traceability file.

Digitalisation of non-conformity management

Non-conformities were handled on paper forms, and the follow-up of the activity lacked a dashboard.

Traceability
Centralised
every non-conformity in a single file, with its KPIs
Roll-out
Whole department
staff trained, procedure sheet
Step into the 3D platform10 steps PDCA · Before / After
OFFICE

Before · non-conformities lost by e-mailAfter · everything traced and managed

Interactive dossier · 3DProposed · solution sized and costedMaFoder · Casablanca · second-year internship

+50 %storage capacity120 → 180 pallet locations

How? Step into the warehouse and watch racks replace floor storage.

Layout of a storage area

Optimise the layout of a storage area, taking into account the physical constraints of the available space.

Access
Direct
every pallet reachable without moving another
Layout
20 racks
3 levels, 3 forklift aisles
Step into the 3D warehouse9 steps DMAIC · Before / After

Before · pallets on the floor, at randomAfter · racks, direct access